3000 sft single storey house with Nadumuttom and chuttu verandah at Kuruppampady near Perumbavoor for Mr.Sunny Mattamana living and working in USA
Monday, January 26, 2009
Friday, January 23, 2009
Foundation beam and basement filling
Nadumuttom columns coming up
Picture shows four round columns for Nadumuttom coming up with earth work excavation,floor concrete,footing concrete in three stages of mat,footing and pedastal reaching upto brick wall level.Excavated pits are of 4 feet by 4 feet in length and width and not less than 4 feet in depth for all 23 concrete columns coming up in the house.Out of these 23 columns only two columns in the rear side for outside toilet and rear verandah are rectangular in size.All otheres coming up in visible areas are all round columns.But the foundation work of 4 level concrete is the same for all 23 columns
Foundation beam concrete getting completed
Foundation beam which is concrete beam with reinforcement of steel on both length direction and width direction is kept above rubble foundation.Brick work for walls of the house come exactly above this.Hence Foundation beam act as a concrete support for the brick walls and also act as an additional strengthening concrete for rubble foundation.Picture shows completed foundation beam
Saturday, January 17, 2009
Foundation beam concrete
Column excavation for Nadumuttom