Monday, April 27, 2009

Brick work reaching roof level
















Brick work has reached roof level .Next item of work is flat roof concreting.Pictures shows brick work reaching roof level

Friday, March 20, 2009

Lintel,flat sunshades,rear roof,loft and berth slabs
















Lintel,flat sunshades on sides and rear,rear sit out roof and round column raising for verandah are completed and site is now ready for brick work above lintel level

Friday, March 6, 2009

Round columns in verandah and lintel concrete




Pictures show round columns coming up in verandah and inside lintels being concreted

Tuesday, February 24, 2009

Brick work reaching lintel level






















Brick work with soild block and very little semi wire cut brick is reaching 218 cm height which is slightly above normal 210 cm height.Lintel leight has to be raised as the front door windows is having a height of 215 cm
Doors and windows are being fixed properly using steel clamps fixed in concrete on both sides after ensuring that both vertical and horizontal levels are properly maintained without any deviation.Pictures show brick work at various points of construction

Thursday, February 12, 2009

Fixing of Front door











Pictures shows fixing of front door and other doors on commencement of brick work

Friday, February 6, 2009

Rubble work for sit out




Rubble work started for sit out behind,sit out on sides and sit out in front.Picture shows commencement of rubble work and plastered outer surface of Nadumuttom

Monday, January 26, 2009

Nadumuttom taking shape




After raising column footings(4 Nos) for Nadumuttom,we have comnnected these columns with 35 cm depth beams to act as support for Nadumuttom walls.On top of this soild block brick work is done and inside and outside will be plastered.Pictures shows the work