Saturday, October 17, 2009

Mukhappu for car porch

Pictures show mukhappu for car porch slope roof



Sunday, September 13, 2009

Slope roof after removal of scaffoldings

Pictures show slope roof concrete for verandah and car porch after removal of scaffoldings

Saturday, August 22, 2009

Slope roof after concreting

Picture show slope roof for verandah and car porch after concreting.Jute bags
are kept above concreted surface for better curing due to water retention capability of jute

Wednesday, August 19, 2009

Slope roof concreting-car porch

Pictures show slope roof concrete work for car porch in progress









Tuesday, August 4, 2009

Slope roof work progresses

Pictures show work in progress of slope roof concrete


Wednesday, July 22, 2009

Slope roof work continues

Slope roof work continues.Pictures show work in progress


Saturday, July 18, 2009

Slope roof work


Work on slope roof on sides,for car porch and for slope roof above Nadumuttom commenced.Pictures show work in progress
.Parapet brick work also completed







Saturday, June 27, 2009

Water curing after concreting

Brick walls were made around concreted surface after roof slab concreting for retension of water for curing.Picture shows concreted surface filled with water and kept for curing for two weeks

Friday, June 5, 2009

Relatives present during flat roof concreting




Pictures show realatives of Sunny Mattamana during flat roof concreting

Flat roof concrete with ready mix machine




















































Flat roof concreting is done with ready mix concreting for a qyuantity of 28M3.Work of concreting started at 7 AM on 5/6/09 and completed by 11 AM.Pictures show work in progress




































































Saturday, May 9, 2009

Nadumuttom columns reaching roof




Four Nadumuttom round columns and one extra round column is reaching up prior to roof concreting.Scaffoldings for earlier concreting is removed and scaffolding work for roof is in progress.Picture shows inner round columns

Tuesday, May 5, 2009

Our Blogs on Kerala Architecture, House construction, interior design, Kerala life, travel and politics

Completed works
http://kerala-houseconstruction-irinjalakuda.blogspot.com/
http://kerala-houseconstruction-cochin.blogspot.com/
Work in progress
http://kerala-houseconstruction-vyttila.blogspot.com/
http://kerala-houseconstruction-nilambur.blogspot.com/
http://kerala-houseconstruction-ranni.blogspot.com/
http://kerala-houseconstruction-josephneroth.blogspot.com/
http://kerala-houseconstruction-sunny.blogspot.com/
http://kerala-houseconstruction-cherthala.blogspot.com/
http://kerala-houseconstruction-elamakkara.blogspot.com/
http://tamilnadu-houseconstruction-ootty.blogspot.com/
Blog and Knoll on Kerala Architecture
http://knol.google.com/k/thomas-viruvelil/kerala-architecture/
http://kerala-architects.blogspot.com/
Blog on Kerala life, Politics, travel and on Kerala Architecture
http://kerala-life.blogspot.com/
DISCLAIMER
Every effort is taken to provide you authentic information on Kerala Architecture and it is features and other relevant information on building a house in Kerala. VIRUVELIL group of Companies or V.H.Thomas or any person interacting through this website on behalf of VIRUVELIL group of companies will not be responsible for the authenticity or correctness of the information provided through this website or conveyed by email to any person contacting us for information, assistance, guidance or for any commercial activity related or followed after any enquiry or request for services /assistance/guidance
We do not accept responsibility for loss or damage arising from the use of the information provided through this website which may be creative work/technical data without our consent/involvement and guidance. We have complete, unchallenged copy right for all information, data, pictures, design details provided through this website. Any dissemination, use, review, distribution, printing or copying in part or full of information, data, pictures design details provided through this website is strictly prohibited.

Monday, April 27, 2009

Brick work reaching roof level
















Brick work has reached roof level .Next item of work is flat roof concreting.Pictures shows brick work reaching roof level

Friday, March 20, 2009

Lintel,flat sunshades,rear roof,loft and berth slabs
















Lintel,flat sunshades on sides and rear,rear sit out roof and round column raising for verandah are completed and site is now ready for brick work above lintel level

Friday, March 6, 2009

Round columns in verandah and lintel concrete




Pictures show round columns coming up in verandah and inside lintels being concreted

Tuesday, February 24, 2009

Brick work reaching lintel level






















Brick work with soild block and very little semi wire cut brick is reaching 218 cm height which is slightly above normal 210 cm height.Lintel leight has to be raised as the front door windows is having a height of 215 cm
Doors and windows are being fixed properly using steel clamps fixed in concrete on both sides after ensuring that both vertical and horizontal levels are properly maintained without any deviation.Pictures show brick work at various points of construction